Boilers and process heaters emit air contaminants including oxides of nitrogen, carbon monoxide, volatile organic compounds, oxides of sulfur, particulate matter and toxic air contaminants. All boilers and process heaters with a maximum heat input equal to or greater than 5 million Btu per hour (MMBtu/hr) require a permit to operate from the District. In addition, units capable of being fired on liquid fuel with a maximum heat input rating equal to or greater than 1 MMBtu/hr require a permit to operate.
Beginning April 1, 2021, the District will begin accepting applications for boilers above 2 MMBtu/hr and less than 5 MMBtu/hr. These “medium size” boilers will require registration or permitting, even if fired exclusively on gaseous fuels. For registering these 2 to 5 MMBtu/hr boilers, see our registration page.
Boilers can operate on a variety of fuels including natural gas, propane or fuel oil. Boilers can be used to produce hot water or steam. Process heaters are used to heat a working fluid other than water where flue gas does not come into contact with the working fluid. Common techniques for controlling emissions include the use of low NOx burners, flue gas recirculation, other combustion modifications, or exhaust aftertreatment with a process such as selective catalytic reduction (SCR).
The information on this page will assist in the completion and
submittal of an application for each boiler and process heater. Each
section of the page contains important information needed to submit an
application.
Need to register a boiler between 2 and 5 MMBtu/hr? See our registration page.
Application forms tell us about your operation and enable us to permit your process. Accurate and complete information decreases processing time and helps avoid additional charges for unnecessary revisions. Please carefully review and complete the following forms. Also listed below are required attachments that must be submitted with each application. For most boilers, you will complete the standard supplemental form. For low-use or temporary boilers (under 220,000 therms per year or under 10% capacity) using natural gas or propane, please complete the low-use/temporary boiler supplemental form only. Low-use/temporary boiler applications may also be submitted online.
Standard Boiler Supplemental Form Word PDF
Low-Use/Temporary Boiler Supplemental Form Word PDF
Required Attachments:
The general and equipment specific application forms along with
all required attachments must be submitted with each application
packet.
The correct application fee, as calculated using the fee estimate form tool below, must be submitted along with your application in order for it to be accepted. Additionally, please include the completed estimate form with your application.
Note: The estimate is designed to provide a good starting point for work on most applications; however, certain situations may require specific types of review that require additional fees. The District will review your application and determine if any of these specific considerations apply and will contact you and provide an invoice if additional fees are necessary.
Instructions: In order to determine the proper application fee, please complete the Fee Estimate Form using the instructions below based on the specifics of your application.
1. "Applicant Site ID/EIF ID” – For applications at existing facility please provide the Site ID number.
2. “Reason for
Submittal” - Identify the reason for application submittal from
the indicated options:
a. New/ Existing Unpermitted (Do not
select for replacements and modifications)
b. Modification –
Includes both physical modifications of equipment and condition
changes.
c. Replacement
d. Change of Location
e. Amendment - Used when modifying an open application
f.
Additional Identical Unit, Applying Same Time - See instructions
below
g. Permit Activation
h. Permit
Reactivation
i. Like Kind Replacement – review requirements
to ensure the replacement meets the requirements specified in Rule
11*
j. other
(*If you are indicating the reason for submittal is Like Kind
Replacement, this will result in a lower fee, but please ensure you
are familiar with the requirements to qualify under this provision
as not all replacements are eligible. If you have a question
regarding applicability of this application type, please contact the District.)
3. “Equipment Type” - Using the dropdown menu, select the equipment type that describes your equipment.
4. “Applicant DBA” - Enter the company name/DBA of the owner/operator of the equipment
5. “Existing Site” - Select whether the location (site) is new or existing (i.e. has existing permits with the District).
6. “Affected Permit Number” - For changes to existing permits, enter the permit number. For amendments, enter the application number being amended.
7. "Estimate Date” – This is the date the form is filled out.
8. “Equipment Description” – Please enter a brief description of the equipment for which the permit is being applied for.
9. “Special
Considerations” - Complete any of the special consideration drop
downs that apply
a. "Number of Units".
Indicate the number of permits you are applying for. If you are
applying for multiple identical equipment at the same time, see
instructions below for using multiple estimate sheets.
b.
"Outstanding Permit Fees." If your permit was
previously retired for non-payment, you may owe back fees. Indicate
yes in this box, and contact the District to determine what total
amount is owed. This must be paid prior to apply to reactive your
permit.
c. "Split Payment". The District has
a split payment option. This allows the application to be paid in two
installments. If you wish to request this option, indicate yes and the
total fee will be divided in two, plus an additional processing fee is
paid with the first application.
d. "HRA Fee not
applicable..." District
Rule 1200 requires that an HRA be conducted for any project that
results in an increase in Toxic Air Contaminants. The estimate sheet
assumes that most applications require this fee; however, certain
applications may not increase emissions or a project may consist of
multiple applications where only one fee is required. If either of
these is the case for your application, use this box to remove the HRA
fee, but note that if this fee is required an invoice will be issued
for the additional amount.
The specific fees that must be included are determined by District Rule 40 and can include fixed fees and/or time and material (T&M) based fees. Please note that T&M based fees are estimates and can vary based on the amount of work necessary to complete the review of the application. Additionally, review of certain requirements, including Health Risk Assessments (HRA), New Source Review (NSR), California Environmental Quality Act (CEQA), and others are also assessed on a Time & Material basis.
Note for Multiple Applications - If you are submitting multiple applications simultaneously, a single fee estimate sheet can be used if all equipment is within the same fee schedule and you are applying for multiple permits. However, note that a single application record will be created for each individual application.
If you are submitting multiple applications simultaneously and wish to take advantage of the multiple identical equipment lower fee provisions of Rule 40, complete an estimate form for the first unit, and then a separate form for the subsequent units, with the reason for submittal as “Additional Identical Unit, Applying Same Time”.
NOTE: The fees listed in this estimate are intended to be the deposit necessary to begin work on your application. In most cases, fees will be accurate; however, some fees are estimates of time & material based fees and the final fee may be more or less than the estimated amount. If additional fees are owed, you will be invoiced for these fees and if any fees are remaining after approval, these will be refunded. Work records are kept for purposes of establishing time and material based fees.
These fees may be paid by check payable to "Air Pollution Control District" or by credit card (Visa, MasterCard, Discover, and American Express).
If you choose to email or fax your application and intend on paying with a credit card, ensure that you have obtained your fee estimate and have it in hand, and then after submitting the application, you must contact the District over the phone at (858)586-2600 to provide payment information.
Please note that credit card payments are assessed a transaction fee of 2.19% that is charged by the credit card provider.
The District will act on complete applications as soon as possible but at most within 180 days. The engineer assigned to your application will review it and contact you within 30 days of receipt to confirm that it is complete or request additional information. Typically permits are issued in about 60 days. More complex processes will take longer. Common reasons that applications may take longer than 60 days to evaluate include: the project is a complex project specifically at a major source, if the project requires a mandatory public notice period due to being installed within 1000 feet of a school or triggering the requirement for a air quality impact analysis (AQIA), if they do not initially pass a health risk assessment (HRA) or AQIA, if BACT is not proposed or complete BACT analysis is not submitted or for major sources if actual emission data is not included.
Ensuring your application is complete is the best way to reduce processing time. Complete emissions data is the most important factor in minimizing application processing time and iterative information requests. If you have any questions about what information is required, please contact the District using the information on the Assistance tab.
Sign up for Citizen Access to get up to date information on the status of your application.
Learn more about the permitting process and what to expect.
If a piece of equipment or a process emits more than 10 pounds per day of particulate matter (PM10), oxides of nitrogen (NOx), volatile organic compounds (VOC) or oxides of sulfur (SOx), the application must include a best available control technology (BACT) analysis. Boilers can trigger BACT requirements for any of these pollutants depending on size and fuel type. If you have questions or need assistance reference the BACT Guidance Document or the contact information on the assistance tab. Please review District Rules 20.1 and 20.2.
District Rule 1200 applies to any new, relocated, or modified emission unit which may increase emissions of one or more toxic air contaminant(s). The proposed project must comply with Rule 1200. Proposed equipment may require toxics best available control technology (TBACT) depending on the project. Please review District Rule 1200 for further details.
District rules address how information that is submitted to the District is managed. District Regulation IX contains District Rules 176 and 177. Please refer directly to these rules when submitting trade secret information. However, be aware that you will need to submit:
Applications submitted with incomplete material composition data due to failure to include proprietary information can significantly delay permit applications. In an effort to expedite the permit application process it is recommended that you contact the manufacturer or vendor of any proprietary materials that are used in the process and prepare the required letters as part of your application submittal.
In 1989, the California state legislature passed a law, AB 3205, designed to protect schoolchildren from hazardous air contaminants. The law, as currently written, requires the District to notify parents of schoolchildren, neighboring businesses and residents of all new or modified equipment that emits any hazardous air contaminant into the air which will be installed within 1,000 feet of a school site. The law also requires the District to consider any comments before authorizing construction. Please review your proposed location. If a school property boundary is located within 1,000 feet of the proposed emissions point, the AB3205 process will be initiated. This process requires a 30 day public comment period and the overall process will delay projects by at least six weeks.
Depending on the installation date, stationary source emissions, and fuel type the following federal New Source Performance Standards (NSPS) and National Emission Standards for Hazardous Air Pollutants (NESHAP) may be applicable to your boiler.
Major source Boiler NESHAP (subpart DDDDD) - Applies to boilers that will be located at major sources of HAP emissions.
Area source Boiler NESHAP (subpart JJJJJJ) - Does not apply to boilers fired only on natural gas or with liquid fuel only for emergencies.
Boiler NSPS - Separate rules for boilers between 10 MMBtu/hr and 100 MMBtu/hr (subpart Dc) and boilers greater than 100 MMBtu/hr that are not utility boilers (subpart Db). The rules contain emission standards for NOx, PM and SOx for some boilers; however, subpart Dc does not have any NOx emission standards. Additional requirements include monitoring and recordkeeping requirements. Most boilers fired on only natural gas or fuel oil meet the requirements of this rule by using low sulfur containing fuels and keeping fuel records.
Utility Boiler Rules - Boilers used to produce steam that is fed to a steam turbine used to produce grid electricity are subject to additional rules include NSPS subpart Da and may be subject to others.
The engineer assigned to an application will review the proposed equipment to determine the requirements of these regulations that may apply and include them as conditions in your authority to construct..
Several District rules may apply to your equipment. General rules that may apply to boilers include Rules 50, 51, 52, 53, 54, and 62.
Equipment specific Rules 69 and 69.2 apply to boilers and process heaters. However rule 69 applies only to electric utility boilers. Rule 69.2 contains emission standards for NOx, testing, monitoring and other operational requirements. Depending on size and annual heat input, the rule requires either annual testing or annual tuneups among other requirements. A complete listing of the District's rules can be found here.
Equipment Calculation Procedures - This page contains procedures to be used for calculating emissions from this equipment that should be submitted with each application.
Use of these calculation procedures will aid in minimizing application review time and costs. The correct emission factors should be selected from the list based on equipment. If available, manufacturer provided equipment specific emission data or source test results should be utilized before using default emission factors. Sources of all emission data used must be included as attachments to the application.
AP-42 - An alternative compilation of emission factors and calculation procedures prepared by the EPA that may be utilized by the District in some situations for some equipment types.